|
|
Boiler Maintenance
|
- Replacement of Boiler High Pressure Parts
- Replacement of High/Low pressure Heaters
- Overhauling of Fan & Pumps
- Overhauling of Combustion equipments
- Overhauling of Boiler Drum (Internal replacement & shell visual/NDT checks)
- Replacement and Overhauling of valves
- Replacement and Overhauling of Instrumentation
- Calibration of Instrumentation
- Loop test and interlock test
- Trial run test of Aux. Equipment for commissioning
- Ignition test of Ignitor and main burner
- Combustion adjustment & Combustion test
- Engineering services
|
|
|
Heater Tube installation at Ashuganj Power Plant, Bangladesh |
|
|
Tube replacement on Heat Exchanger at Ashuganj Power Plant, Bangladesh |
|
|
|
|
|
|
|
|
|
Boiler Rehabilitation at Ashuganj Power Plant, Bangladesh |
|
|
|
|