Jimma: HP Heater Replacement Works, Malaysia
Project Details:

Project Name: HP Heater #5  Replacement works 

Owner: Jimma Unit 20

EPC Contractor: TPSC Engineering (M) Sdn Bhd

Project Duration:  Mar 2016 – Aug 2016 

Critical Works:
  • New HP header weight 85 Tons
  • Proper Cutting plan for pipes and rigging works were challenging
  • All the Inter connecting pipes were under stress due to operation for more than 8 years
  • Temporary arrangements were done to lock the pipe joints